dc.contributor.authorZafirovski Zlatkoen_US
dc.contributor.authorDimitrijevic Jelenaen_US
dc.contributor.authorBiljana Matejevićen_US
dc.contributor.authorMarko Milijićen_US
dc.date.accessioned2024-03-02T11:00:26Z-
dc.date.available2024-03-02T11:00:26Z-
dc.date.issued2021-10-
dc.identifier.isbn978-954-331-117-0-
dc.identifier.urihttp://hdl.handle.net/20.500.12188/29642-
dc.description.abstractThere are several applicable methods for railway reconstruction. This work presents continuous method with gantry crane on the specific railway route Svrljig-Knjaţevac. It is shown how adaptable continuous method can be in a long gorge with lot of series tunnel-bridge. At great length there were no other approaching roads but railway itself. The route is characteristic, with difficult conditions for machine approach and work. Mentioned method provided good results, but there were some situations that could not be resolved by it. These problems are solved under favour of contractor practise. Other available methods are mention for comparison, with short explanation of their characteristics.en_US
dc.language.isoenen_US
dc.subjectRailway reconstruction, Continuous method, Gantry crane, Svrljig Knjaževacen_US
dc.titleAPPLICATION OF THE CONTINUOUS METHOD WITH GANTRY CRANE ON RAILWAY RECONSTRUCTIONen_US
dc.typeProceeding articleen_US
dc.relation.conferenceXXI INTERNATIONAL SCIENTIFIC CONFERENCE ON CONSTRUCTION AND ARCHITECTURE VSU'2021en_US
item.fulltextWith Fulltext-
item.grantfulltextopen-
Appears in Collections:Faculty of Civil Engineering: Conference papers
Files in This Item:
File Description SizeFormat 
Bugarski kongres.pdf816.05 kBAdobe PDFView/Open
Show simple item record

Page view(s)

12
checked on Jul 11, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.